Technical Due Diligence & Design

EU Market Access
Engineering

We bridge the gap between your EVSE hardware and the fragmented reality of European Grid Codes — from National Standards to hyper-local DSO requirements.

EU-27
Market Coverage
ISO 15118
V2G Protocol
900+
DSO Profiles
TÜV / DEKRA
Lab Partner Network
EN 50549-1
Continental Baseline
ISO 15118
V2G Communication
IEC 61851
EVSE Safety Standard

The "Harmonization" Trap

Compliance is not a checkbox; it is a multi-dimensional matrix. A single hardware SKU must adapt to 27+ national grids and hundreds of local DSO sub-regulations.

01

Continental Baseline

EN 50549-1 / RfG

High-level requirements for generating plants. Necessary for CE marking, but insufficient for grid interconnection approval in major markets.

CE Marking Prerequisite
03

DSO Local Codes

TAB (Technical Connection Rules)

Hyper-local parameter sets (e.g., Reactive Power Q(U) vs cos(φ)) dictated by local grid topology (E.ON, Enedis, Iberdrola).

900+ Parameter Profiles

Engineering Service Modules

Download Capability Statement

Hardware Gap Analysis

PHASE: PRE-PROTOTYPE

A clause-by-clause schematic review against "Worst Case" EU market requirements. We identify missing safety components before you cut steel.

Audit Scope

Safety Chain Redundancy

Verification of dual-series disconnect relays per VDE-AR-N 4105.

Leakage Protection (RCD)

Audit of Type B RCD integration & 6mA DC detection circuits.

EMC & Supraharmonics

Filter topology review for 2–150 kHz range compliance.

Physical Interfaces

Shuttered sockets (France) & PEN Fault detection (UK).

Additional scope includes: Islanding Detection, Thermal Management, Isolation Monitoring, Ingress Protection (IP), Galvanic Isolation, and more.
Request full list

Grid Code Parametrization

PHASE: FIRMWARE

Delivery of precise JSON/Header files containing the exact trip limits and control curves for specific DSOs, ensuring firmware compliance from first boot.

Deliverables

Ride-Through Curves

FRT/LVRT voltage-time boundaries for G99 vs Continental.

Reactive Power Modes

Look-up tables for Q(U), Q(P), and cos φ(P) control.

Active Power Gradients

Soft-start and ramp-rate limits defined per country.

Ripple Control Logic

Logic mapping for external active power curtailment signals.

Additional deliverables include: Anti-Islanding Settings, Power Quality Limits, Reconnection Sequences, Export Limitation Profiles, Harmonic Current Limits, and more.
Request full list

Universal Meter Integration

PHASE: SYSTEM INTEGRATION

Reference design support for the "Universal Bridge" interface to ensure interoperability with fragmented European metering standards.

Technical Scope

Universal Interface

Combined RJ12 (P1) / RJ45 (HAN) / RS485 schematic design.

Protocol Parsing

Drivers for DSMR (NL), M-Bus (Nordics), and SML (DE).

SMGW Encryption

Consulting on BSI-certified TR-03109 comms modules (Germany).

MID Compliance

Measuring Instruments Directive requirements for billing-grade data.

Engagement Framework

From Schematic to Certificate — a structured, transparent process.

01

Discovery

NDA signed. Transfer of BOM, Schematics (PDF/Altium), and Target Market List.

Day 1–3
02

Gap Analysis

2-Week deep dive. Output: The "Red Flag Report" identifying hardware showstoppers.

Week 1–2
03

Remediation

Delivery of Engineering Change Orders (ECOs) and Firmware Parameter JSON files.

Week 3–5

Certification

We interface with TÜV/DEKRA to answer technical queries during testing.

Market Ready
€20k+
Average cost of a failed certification — test fees, redesign, and lost time-to-market.
3 mo+
Typical delay from a single red-flag issue discovered during type-testing.
92%
First-pass certification rate for clients who complete our pre-compliance review.

Don't guess on Grid Codes.

A failed certification costs €20k+ and 3 months of delay. De-risk your product launch before you commit to tooling.

Request a Technical Briefing

We'll get back to you within 24 hours.

What to Expect

  • A 30-minute technical call to understand your product and target markets
  • Preliminary compliance gap overview at no cost
  • Custom scope and pricing tailored to your needs
  • NDA available before any technical details are shared

Response Time

We typically respond within 24 hours on business days. For urgent requests:

[email protected]